Non-Compliance detail


  
Summary
 
Licence number: 12290
Annual Return Start: 01 Apr 2015
Annual Return End: 31 Mar 2016
Date Received: 25 May 2016
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L4.1 Noise exceedance generated by 5600 excavator and trucks dumping on out of pit dumps. Mining equipment stood down throughout the evening to minimise impact. Equipment recommenced once noise levels were at an acceptable level EPA has written to licensee regarding non-compliance and relevant action 1
L5.8 & M7.1 Loss of communications resulted in a missed measurement of vibration & overpressure for a blast (#2016-028). This resulted from changes to mobile network in the area the blast monitor is located. A physical reboot was unsuccessful at the time. Appropriate Action taken by licensee 1
M2.2 Due to a power loss, monitoring was not undertaken on three occasions. Previous owner of property disconnected power. Reconnection of power was requested from energy supplier EPA to monitor future compliance with this condition 3